Click on a photo to enlarge.
By April 2024, the new roof was installed and the property was back in compliance and protecting both his investment and his tenants. Another job done the RRG way: quick response, clear communication, and results that keep homeowners covered when it matters most.
We tore everything off and hauled it away, then installed synthetic underlayment across the whole roof. Added new drip edge along the eaves and rakes, even removing and reinstalling the gutter wire so it was done right. We hit all the problem areas with ice and water shield, chimneys, valleys, pitch changes, and pipe boots and taped all the seams. We also capped turbines and sealed off any extra holes with OSB to tighten everything up.
Finished it off with IKO Cambridge in Harvard Slate. Clean look, solid system, and backed by a 50-year shingle warranty and 2-year workmanship warranty
